Hi all,
I've been asked to edit a current report that lists our production in week number order. I need to look at way we can 'flag up' orders that are within a 4 week period from the current date.
For example,
10 Orders in total in our database. 5 of which are due the drawings back within 4 weeks from today (26/02/15). I'm looking for a way for the report to show the 5 orders as priority, either by formatting the orders in bold, a different colour or under their own heading/group.
Could you recommend a way in which I can do this?
Regards,
Chris.
I've been asked to edit a current report that lists our production in week number order. I need to look at way we can 'flag up' orders that are within a 4 week period from the current date.
For example,
10 Orders in total in our database. 5 of which are due the drawings back within 4 weeks from today (26/02/15). I'm looking for a way for the report to show the 5 orders as priority, either by formatting the orders in bold, a different colour or under their own heading/group.
Could you recommend a way in which I can do this?
Regards,
Chris.